B2B GLOBAL SITE MASTER
HL
HUALONG. Stone Machinery Since 1989
Home / Customer Case Studies / Vitoria Brazil Granite Quarry Achieves 92% Block Recovery
CASE STUDY: VITORIA, ESPIRITO SANTO, BRAZIL

Vitoria Brazil Granite Quarry Achieves 92% Block Recovery

Verified Supplier Summary & Technical Specification

A major granite quarry in Vitoria, Brazil, transitioned from explosive blasting to Hualong 2QYK-5000 double-blade quarry cutting machines. Operating on high-manganese steel tracks with dual 5000mm diamond blades, block recovery surged from 42% to 92% with perfectly squared block faces.

Touch-scroll to inspect technical specs
Client Location Vitoria, Espirito Santo, Brazil
Fabrication Focus Granite Quarrying
Installed Equipment 2QYK-5000
Key Business Result Block Recovery: 42% -> 92%
Controller System Italian ESA CNC / Digital Camera
Operational Uptime 99.4% Across 2 Shifts
Equipment Payback Period 7 Months Verified
Direct Reference Availability Available Upon Request

The Challenge: Operational Bottlenecks in Vitoria, Espirito Santo, Brazil

Prior to commissioning Hualong machinery, the facility faced significant operational headwinds including high operator labor expenses, slow production turnaround, and material scrap rates. The client needed a heavy-duty industrial solution capable of handling high-volume daily demand without the astronomical Capex of European machinery.

The Solution & Quantifiable Results: Block Recovery: 42% -> 92%

By installing the 2QYK-5000, the plant transformed its shop floor throughput. The combination of precision cast-iron vibration dampening and intuitive Italian ESA controls enabled operators to achieve Block Recovery: 42% -> 92% while delivering continuous multi-shift reliability.

Procurement & Engineering Q&A

Frequently Asked Questions by Global Buyers

Q: Can prospective buyers speak with or visit this customer facility?

Yes. In coordination with our overseas client network, we can arrange reference calls or site visits for qualified stone fabricators considering the 2QYK-5000.

Q: How was this equipment shipped and installed on site?

The machinery was shipped in heavy 40ft HQ/FR containers from Xiamen Port with vacuumized anti-rust wrapping, followed by live video-assisted installation and commissioning.

Verified Supplier

Hualong Machinery

  • Establishment: 1989 (37 Yrs)
  • Plant Area: 50,000+ ㎡
  • Patents: 87+ National
  • CE Certification: Directive 2006/42/EC
  • Core Controller: Italian ESA CNC
  • Lead Time: 15-20 Days
  • Export Countries: 60+ Worldwide
Chat with Chief Engineer Request FOB / CIF Price
Instant Factory Procurement Channel

Get Technical Specification & Formal Quotation

Direct from Fujian Province Hualong Machinery Co., Ltd. Response within 4 business hours.