Vitoria Brazil Granite Quarry Achieves 92% Block Recovery
A major granite quarry in Vitoria, Brazil, transitioned from explosive blasting to Hualong 2QYK-5000 double-blade quarry cutting machines. Operating on high-manganese steel tracks with dual 5000mm diamond blades, block recovery surged from 42% to 92% with perfectly squared block faces.
The Challenge: Operational Bottlenecks in Vitoria, Espirito Santo, Brazil
Prior to commissioning Hualong machinery, the facility faced significant operational headwinds including high operator labor expenses, slow production turnaround, and material scrap rates. The client needed a heavy-duty industrial solution capable of handling high-volume daily demand without the astronomical Capex of European machinery.
The Solution & Quantifiable Results: Block Recovery: 42% -> 92%
By installing the 2QYK-5000, the plant transformed its shop floor throughput. The combination of precision cast-iron vibration dampening and intuitive Italian ESA controls enabled operators to achieve Block Recovery: 42% -> 92% while delivering continuous multi-shift reliability.
Frequently Asked Questions by Global Buyers
Q: Can prospective buyers speak with or visit this customer facility?
Yes. In coordination with our overseas client network, we can arrange reference calls or site visits for qualified stone fabricators considering the 2QYK-5000.
Q: How was this equipment shipped and installed on site?
The machinery was shipped in heavy 40ft HQ/FR containers from Xiamen Port with vacuumized anti-rust wrapping, followed by live video-assisted installation and commissioning.
Hualong Machinery
- Establishment: 1989 (37 Yrs)
- Plant Area: 50,000+ ㎡
- Patents: 87+ National
- CE Certification: Directive 2006/42/EC
- Core Controller: Italian ESA CNC
- Lead Time: 15-20 Days
- Export Countries: 60+ Worldwide
Get Technical Specification & Formal Quotation
Direct from Fujian Province Hualong Machinery Co., Ltd. Response within 4 business hours.